hakiki, ahmad ashfarin (2020) ANALISIS PENGARUH COVID-19 TERHADAP PENJADWALAN PRODUKSI ALMARI DI PT MITRA ANUGRAH GEMILANG DENGAN MENGGUNAKAN STRATEGI AGREGAT PLANNING. Bachelor thesis, UNIVERSITAS ISLAM MAJAPAHIT.
Text
Pj ABSTRAK-dikonversi.pdf Restricted to Registered users only Download (744kB) | Request a copy |
||
|
Text
BAB I PPC.pdf Download (137kB) | Preview |
|
Text
BAB II PPC.pdf Restricted to Registered users only Download (234kB) | Request a copy |
||
Text
BAB III PPC.pdf Restricted to Registered users only Download (126kB) | Request a copy |
||
Text
BAB IV PPC.pdf Restricted to Registered users only Download (223kB) | Request a copy |
||
|
Text
BAB V PPC.pdf Download (38kB) | Preview |
|
|
Text
DAFTAR PUSTAKA PPC.pdf Download (130kB) | Preview |
|
Text
LAMPIRAN PPC.pdf Restricted to Registered users only Download (307kB) | Request a copy |
Abstract
PT. Mitra Anugrah Gemilang has furniture products in the form of cupboards, TV racks and lockers with the “Astro Box” brand. There was instability in production scheduling at PT Mitra Anugerah Gemilang due to the COVID-19 pandemic and the processes that support the smooth production schedule were also affected, so what strategy will be used for scheduling production amid the Covid-19 pandemic. This study uses an aggregate planning strategy and proposes a production schedule with two scenarios to compare which costs are the lowest. The results of the production scheduling analysis using the aggregate planning strategy method of chese strategy, from the company's production schedule, the state of COVID-19 has a fairly large cost when affected by COVID-19 of Rp. 1.008,000,000, so the researcher proposes two scenarios for the selection of the lowest cost, the researcher proposes a scenario 1 at a cost of Rp. 403,200,000 because the cost is lower than in scenario 2 at a cost of Rp. 549,000,000, the difference is Rp. 145,800,000, the difference in the company's production schedule with scenario 1 is Rp. 571,200,000.
Item Type: | Skripsi/Thesis (Bachelor) |
---|---|
Uncontrolled Keywords: | production scheduling, aggregate planning, the influence of COVID-19 |
Subjects: | 0 Majapahit Islamic University Subject Areas > Fakultas Teknik > Teknik Industri |
Divisions: | Faculty of Engineering > Industrial Engineering |
Depositing User: | AHMAD ASHFARIN HAKIKI |
Date Deposited: | 11 Dec 2020 07:26 |
Last Modified: | 30 Jun 2023 14:03 |
URI: | http://repository.unim.ac.id/id/eprint/2748 |
Actions (login required)
View Item |